Location:
Blaine, WA
Project Overview:
This development in the BP Cherry Point Refinery included the design and construction of a P-5 double ended substation building and associated subsurface electrical duct banks. Substantial excavation and utility installation was necessary for this construction.
Services Provided:
GeoTest provided environmental consulting and sampling services throughout the early phases of this project. Environmental soil sampling was provided during alignment and excavation of the planneed utilities to establish disposal characterization for the existing soils.
Owner:
BP West Coast Products
Project Cost:
$20 Million