British Petroleum (BP) Renewable Diesel Project

Location:

Blaine, WA

Project Overview:

This project included the development of two new water tanks in the area adjacent to the existing clean diesel unit. These tanks are approximately 40 feet in diameter and 32 feet tall.

Services Provided:

GeoTest provided geotechnical engineering during the design phase of this project. We explored subsurface conditions with borings to develop a subsurface profile, which was used in formulating our design recommendations. Our scope included seismic analysis, tank support recommendations, and earthwork recommendations during construction.

Owner:

BP West Coast Products

Project Cost:

$20 Million

Additional Services Provided:

Earthwork Observation and Testing, Reinforced Concrete Inspection, Structural Steel Inspection, Adhesive Anchor Inspection, Concrete Cylinder Testing

Contact Geotest

Geotest welcomes the opportunity to become a part of your team and build the success of your company. We provide Construction Special Inspection and Materials Testing Services throughout Northwest Washington. Our Geotechnical Engineering Department and Environmental team can provide services in Washington State and Oregon.

  • This field is for validation purposes and should be left unchanged.