Waterfront Place is a large-scale mixed-use development that will be inclusive of residential, hospitality, office, retail, and light industrial/craft uses.
All vertical construction special inspection and testing. Civil and sports fields general testing, as well as specialty testing for synthetic turf fields, vertical construction envelope testing, & inspection
This project entails the development of 16 acres for a new Quil Ceda Creek Casino. The first phase of construction included a 110,000 square foot casino with entertainment and dining facilities along with a six story 1200 square foot parking garage.
The new membrane bioreactor (MBR) Oak Harbor Clean Water Facility is adjacent to Windjammer Park along the Oak Harbor waterfront. This project includes multiple new surface and below grade structures including the installation of a new processes creating a new replacement wastewater treatment facility.
This two phased project includes 90,000 square feet of new construction and 36,000 square feet of remodeled construction. Additionally, the project included new stadium grandstands and a new stormwater detention facility.
This project included the construction of a new 6 million gallon reservoir and booster pumping station to replace the aged and undersized existing system.
This project consists of new facilities at the entrance and gateway to Whatcom Community College.
This project included the construction of a new academic building as part of the Everett University Center (EUC) and is located across from the Everett Community College campus.
This project included the construction of a new Boys and Girls Club located in the Harbour Pointe community.
This FAA funded project involved the replacement and relocation of Taxiway Bravo and reconstruction of the North Ramp Taxilane.